Brief Description: Right fuselage side and spar attach
5 hours to build the left side, but the right was assembled in 2.5 hours. I'm glad most of the plane is 2 of everything...
I then spent a lot of time figuring out how to align and drill the brackets to attach the center spar. Had to email Dave to find the bolt spec as the plans did not specify (AN3 if anybody is listening),