KitLog pro

Powered By Kitlog Pro v2.0

Jasons Thatcher buildlog
' style=
Date:  7-20-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Spar cap taper

My goal was to get the spar caps tapered. 8 cuts, each one 53" long. I could not get the waterjet nozzle close enough to cut because of the angle leg in the way. I moved to the band saw and one cut took 20 minutes and looked messy. I will have to construct a jig to hold the angle in a position so the waterjet can cut it.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.