KitLog pro

Powered By Kitlog Pro v2.0

Tim and Darren Aussie Web Site
' style=
Date:  2-25-2008
Number of Hours:  2.00
Manual Reference:  2.140 step 40
Brief Description:  Install flap deployment and retraction cable

We made up the inboard cable guides from polyethylene block. This was cut into shape and rivetted to the guides. This is to ensure the cables are gliding over a smooth surface and supported in the correct area. The diagram for the flap cables took a little while to work out but after realising the cable cross over to the other side of the fuselage; we had it under control. The cables join onto the flap handle and form the loop.
' style=

Cable retainer clip securing cable

Cable retainer clip securing cable

' style=

Cables protrude to the other side of the fuselage

Cables protrude to the other side of the fuselage

' style=

Flap cables joining handle in the loop

Flap cables joining handle in the loop

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.