Date:
10-5-2015
Number of Hours:
4.50
Manual Reference:
Brief Description:
Electric cable, sniffle valve
Another day where I had a hard time getting traction, but I did get a few things checked off the list, so to speak,
The electric cable running from the master relay through the firewall and to the Vertical Power VP-X was fabricated and installed.
The Alternate Air control cable was cut to length and installed to the cockpit and through the firewall.
The cabin floor was given a good vacuum and wipe down. Hopefully I am through drilling through the firewall.
The cover below the heater outlet was notched for the throttle cable.
The "sniffle" valve was installed on the induction sump and the drain tubing cut to length, formed and installed.
Electric cable
Cover notched for throttle cable
Sniffle valve and tubing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.