KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  9-23-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Panel frame and brackets, mount toggle switches to

Got some odds and endsdone today.

A bracket for the Alternate Air control was fabricated from angle, drilled to the panel bottom angle and riveted. I riveted the panel frome to the panel bottom angle. Also riveted the throttle quadrant brackets to the panel bottom angle and the bottom of the sub-panel. The throttle quadrant was bolted to the brackets.

Drilled screws were used to mount the throttle and mixture control brackets tot he engine and were safety wired.

I brought panel pieces and the toggle switch components home and assembled the switched, affixed labels and mounted these to the panel.
' style=

Alternate air bracket and throttle quadrant

Alternate air bracket and throttle quadrant

' style=

Cable brackets safetied

Cable brackets safetied

' style=

Switches mounted to panel

Switches mounted to panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.