KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  3-23-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Begin riveting of forward deck

Today I fabricated the fuel line doubler from sheet stock. This was then drilled to the firewall. All holes were deburred and countersunk as needed. Doubler was riveted to firewall. Fuel pass-through fitting was attached to firewall and doubler.

I reassembled the foreward deck ribs and subpanel parts. There were clecoed in place. Ribs were riveted to the firewall, then the center reinforcement angle and plate were riveted to the center rib.

The oil and fuel pressure sensor manifold was installed.
' style=

Fuel line pass-through

Fuel line pass-through

' style=

Foreward deck assembled

Foreward deck assembled

' style=

Manifold

Manifold

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.