KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  1-3-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Static run and wiring

I spent a bit more time at the hangar considering static, pitot and AOA tubing routing then took wire and electrical supplies home to work in the warm. I wired a test harness for the trim servos and both checked out proper operation of the servo and indicator. The servos are now ready to install in the airplane. I also assembled the wiring harness for the nav and strobe lights in the wingtips and tail.
' style=

Nav/Strobe wiring harness

Nav/Strobe wiring harness

' style=

Junction area

Junction area

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.