Brief Description: Static tubing, AP servo bracket
In preparation for riveting the aft top skins I mounted the static tubing loop between the static ports on the sides and also drilled the pitch autopilot servo bracket to the brace, deburred and riveted. The bellcrank was drilled to accept the AP pushrod.