KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  10-27-2015
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Baffles

Deburred and countersunl the right air ramp parts as required. Riveted parts together. Opened up hole for prop oil hose. Installed right air ramp. Installed Prop oil supply line.

Rerouted cabin heat hose.

Installed left air ramp.

Made and installed 3 of 4 wire pieces that secure the bottom tabs on the cylinder shrouds. These are made from stainless wire and must be threaded at each end which was a chore!!
' style=

Right air ramp

Right air ramp

' style=

Left air ramp

Left air ramp

' style=

Shroud wires

Shroud wires

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.