KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  9-24-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Air induction

Began work on the James Aircraft air induction sustem.

First the rubber flange at the bottom of the K&N filter was trimmed to fit inside the housing.

Next the back plate was sanded to fit inside the filter housing.

Then the transition plate was fitted to the back plate. This included making up a batch of micro to make a perfect fit between the transition bottom and the back plate.

Lastly the fittings for the oil cooler hoses were installed in the engine block.
' style=

Air induction components

Air induction components

' style=

Back plate and transition being fitted

Back plate and transition being fitted

' style=

Oil cooler fitting installed

Oil cooler fitting installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.