KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  8-13-2015
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Fuel vent, oli tank bracket, engine controls

Did more thinking than working today.

I did get the fuel vent line fabricated and installed on the fireall and motor mount. I also made up a tab to secure the 4th corner of the Christen oil tank.

Much of the rest of the day was spent on the floor looking up at the underside of the engine, trying to determine the best was to run the throttle and mixture control pushrods.I did come up with a configuration I think will work and started fabricating brackets to hold the cables.

I also did some contemplating Red Cube fuel flow transducer location and fuel hose routings.
' style=

Fuel vent

Fuel vent

' style=

Oil tank bracket

Oil tank bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.