KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  8-5-2015
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Christen inverted oil system

Today is my Dad's 90th Birthday!! Happy Birthday Dad!!!

Today I continued installation of the Christen inverted oil system. The oil valve was mounted to the fuselage after fabricating a doubler, drilling it to the firewall, drilling for platenuts, deburring, dimpling and countersinkin and riveting the doubler.

The oil sump, return and strainer fittings were all installed after removing the respective plugs.

A doubler the fof the breather "T" fitting was fabricated and drilled, platenuts drilled, holes deburre and dimpled or countersunk as required.
' style=

Oil valve installed

Oil valve installed

' style=

Fittings installed

Fittings installed

' style=

Preparations for Breather

Preparations for Breather "T".

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.