Date:  6-13-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Wing kit delivery

The wing kit was delivered today by Con-way freight. I had ordered this at the end of March. I was concerned about being able to unload these without additional help but it turned out to be a breeze. The delivery truck had a lift gate, and the crates were each about 200 pounds. It was pretty simple to get the crates down to the ground and onto moving dollies and then scoot them right into the hangar. I still have to complete the left elevator so the wings won't get any attention for at least another week. I did remove the top of the wider crate to take a look and continue to be impressed with the quality job that Van's does with packing and crating. They have this down to a science.
' style=

The truck arrives at the hangar

The truck arrives at the hangar

' style=

Both crates moved into the hangar

Both crates moved into the hangar

' style=

Opened one crate to take a peek

Opened one crate to take a peek