KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  3-26-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Finalized Brake system but had to redo

I spent the morning finalizing the external brakes system installation which included safteying the fasteners, tie straps and the coil spring and positioning of the lines in relation to the calliper assemblies on the wheels. Posted my pics to the AP/builder I often refer to on avcom and was informed that my instalation was wrong and had to be redone. I had to remove and disassemble the entire system and do it again properly given the wrong twist in the lines, there was not enough straight line in at the callipers and the coil was too close to the spinning brake discs on the wheels.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.