KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  3-23-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Brake callipers and external lines assembly

Continued and finalized assembly of the callipers L&R and the final installation and positioning of the external brake lines and unions. Had the callipers the wrong way round initially since mine weren't marked L&R out the box but with some help figured it out and swopped them over and marked them accordingly with what is confirmed to be the right locations. Final torqued the interior brake line unions at the L&R exits and firweall intersections and resevoir. Checked for a final time for leaks and am happy with the system as is.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.