KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  2-17-2012
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Finalized heatX installation, Fuel line penetratio

Final installation, sealing and seqating of heat exchange box to firewall, cable nut, and mounting nuts secured with epoxy safety. Made up the firewall to motor fuel line assembly including the firewall penetration assembly made of a firewall doubler riveted in place, a spacer/washer fabricated from stock and the relevant couplings and fittings. Sealed and installed the assembly in place and fitted the fuel hose - ready for direct fit to engine fuel pump. Also made up and fitted the fuel pressure hose assembly and installed it in place on the transducer manifold.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.