Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
Fuselage
9-8-2022
< Previous Log Entry
Next Log Entry >
Date:
9-8-2022
Number of Hours:
2.40
Manual Reference:
SNB-D02
Brief Description:
Canopy Finishing Touches
Fabricated the canopy locking insert.
Layed out, drilled and cut the two tabs for the assembly on the CNC, then deburred and riveted the assembly together.
Drilled, countersunk, and installed the last two screws for the red ball know and the spring retaining screw for the canopy slide latch assembly.
Cutting the two locking tabs to make the canopy locking tab assembly.
The latch spring retaining screw and the slide assembly ball knob installed.
Completed canopy slide latch assembly.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.