KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  2-26-2016
Number of Hours:  6.00
Manual Reference:  8s9r3.pub 06/16/01
Brief Description:  Drilling the canopy and frame

Page 9-3
Drilled the C-801 canopy and frame with #40 drill. Before drilling I preheated the fuselage with a small ceramic heater.
' style=

Drilling the frame with number 40 drill

Drilling the frame with number 40 drill

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.