KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
Work Logs Found: 24
Category Work Time: 108 Hours
 Date
Hours
Work Log Summary

Details

 01-14-2019
2.00
Installed OAT sensor in right wing
Details
       

 10-19-2018
3.50
Installed Garmin GAP 26 Air Data Probe Control Box
Details
       

 10-05-2018
4.00
Control Yoke Wiring
Details

 04-24-2017
4.00
GPS Antenna Mount Shelf
Details
       

 04-23-2017
2.00
GPS Antenna Shelf
Details
       

 03-16-2017
2.00
Antennas
Details
       

 03-10-2017
4.00
Fuel flow interfaces
Details

 09-28-2016
5.00
Installed flap positioner sensor
Details
       

 08-24-2016
3.50
General Fuselage wiring
Details
       

 08-21-2016
4.00
Integrated Battery Backup System
Details
     

 08-14-2016
1.50
Installed ELT antenna
Details
       

 07-21-2016
1.00
Riveted the ADS-B antenna and mounted antenna
Details
       

 07-20-2016
2.50
ADB-B Antenna doubler
Details
       

 06-08-2016
4.00
Change to Instrument panel
Details
       

 06-08-2016
3.00
Change to avionics wiring
Details
     

 11-22-2015
4.00
Installed switch indicator plate
Details
       

 03-20-2014
12.00
Power up
Details
       

 02-18-2014
25.00
instrument mounting
Details
       

 12-28-2013
6.00
instrument panel
Details
       

 09-15-2013
1.00
Test fit avionics
Details
       

 09-15-2013
5.00
Magnetometer mounting
Details
       

 09-14-2013
5.00
Magnetometer mount
Details
     

 09-13-2013
1.50
Panel from SteinAir
Details
     

 10-22-2010
3.00
Drilling fuselage skins
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.