Spent a couple of hours moving the shop "hanger" around. Started by loading the rear fuselage on a roll around and pused it outside. The table/bench was then broken down to two pieces (8" and 4") and repositioned in the shop. I then brought in two low saw-bucks and installed the 12' square tubes on them and moved the rear fuselage back on to this new arrangement. The rest of the day was spent getting the fuse into positon, secured, leveled, measured, squared etc.......