KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  1-16-2019
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Gearbox cover and brake lines.

Jeanne brought in the bolts Ken had finally found (and polished up) and we test fit them,and they are correct! I removed the rubber mounts and sleeves. The sleeves are pretty rusty and one is cracked. WIth Kurt's help Jeanne ordered tubing to make new ones.

Jeanne helped me get the gearbox cover back off. We trimmed excess material from the ends to ease installation and removal. I trimmed out a few places of interference with the underlying structure. We riveted the attach brackets and trim wheel cover in place.

Jeanne tried to install lft side brake line while I removed baggage area curtain.

After Jeanne left I got Bill to help me jack up lft side and remove gear leg. I noticed that I had not trimmed flange on bottom skin to size, and that was what was causing diffculty in installing brake line. I trimmed it with the new oscillating saw, and was able to install all pieces of left brake lines. Will fll with fluid and test next.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.