KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  11-21-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Swapped gear legs.

Removed MLG and inserted temporary legs. Stowed fuselage in back of hangar. Began disassembly of gear/wheels. Removed steps and brake lines. Removed wheel from left gear leg. Some brake parts need to be replaced. See pictures.
' style=

Brake assembly.

Brake assembly.

' style=

Disk retainer.

Disk retainer.

' style=

Parts.

Parts.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.