KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  11-7-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  More disassembly & inspection.

Removed all carpets. Found them to be disintegrating. Pushed up firewall pad and removed tunnel cover. Removed old speaker. Met with Bill to discuss options. I will research any possible previous repairs to aft spar bulkhead. Began removal of cover plates near MLG openings to expose door post cracks.
' style=

Pad out of the way.

Pad out of the way.

' style=

Box of yucky carpets.

Box of yucky carpets.

' style=

Rotted out speaker.

Rotted out speaker.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.