Made the flange bends in the floor panels, they are done for now. Loked at brace that connects to lH lower motor mount, decided to make a new one from .040 T0 and send it out with the bulkheads. Jeanne and I removed most of the remaining rivet shanks from the fuselage and miscellaneous parts. Damaged a doubler (not original parts) at the top of the RH doorpost. This will have to be replaced, but first research needs to be done as to why it is there.