Powered By Kitlog Pro v2.0
Bens RV-10 Site (Non-Active)
RV-10
Elevator
12-30-2011
< Previous Log Entry
Next Log Entry >
Date:
12-30-2011
Number of Hours:
4.50
Manual Reference:
Ch 9
Brief Description:
Finishing dimpling the elevator skins
Yesterday I wrapped up the dimpling on the skins and did some surface prep (sanding/scotchbrite) for the parts.
At this point, all I really need to do is finish the priming exercise and the elevator is ready to assemble (minus the trim tab).
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
101
277
Education
2
20
Elevator
25
64
Empennage
2
16
Horizontal Stabilize
18
48
None
1
0
Rudder
13
30
Shop Supplies
1
1
Tailcone
27
64
Tools
3
3
Vertical Stabilizer
9
31
Copyright © 2001-2024 Matronics. All Rights Reserved.