Date:  2-1-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Move Necessary Items to Hanger

Other than the remaining large items such as the main rotor head and transmission, all of the other helicopter parts were at the home shop and need to be collected and moved to the hanger. There are parts stuck all over the place in the shop and I had to wrangle them up and get them loaded into the truck.

These items included main rotor blades, control rods, pitch links, misc. bolts, washers, nuts, cotter pins, interior seat and headboard panels, tools, misc. transmission parts, drive shaft, seats, ladders, bubble clips, boxes of clamps, scrap sheet metal, wire, electrical tools, and other general misc. hardware.

In addition, I moved all the paperwork, manuals, books, reference materials, etc. I finally put all of the specification sheet, component information, schematics, certification paperwork, and other important documents and cut sheets into plastic covers and put them in the construction binder that I created at the beginning of the project.

I’ve already told Tom that I KNOW I’m going to be running back and forth from shop to shop to get additional tools and other items I forgot.
' style=

New tool box and tools

New tool box and tools

' style=

All the laddars I own

All the laddars I own

' style=

Gantry crane

Gantry crane

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.