KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  10-19-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  F/Tanks: Inboard Ribs Inspection Hole Cut-Outs

I cut out the inspection holes on the inboard ribs as per plans using a drill press and a fly-cutter (horrible thing - make sure your work is well and truly clamped). I deburred and edge prepped the holes,cleaning them up nicely and then aligned and clamped the reinforcement rings in place double checking alignment and positioning.
' style=

Using a fly-cutter to cut out the inspection hole

Using a fly-cutter to cut out the inspection hole

' style=

1st inspection hole done

1st inspection hole done

' style=

Both ribs done with re-inforcement ring clamped in place

Both ribs done with re-inforcement ring clamped in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.