KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  1-22-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Installed Relays and Started Wiring

Installed all 10 realys and started wiring. Ran Wires for Both Rear Canopy Prox Sensors using 22 AWG wire. I had to extend the wires for the PROX sensors about 4 feet so I twisted and soldered the wires then used Heat shrink over each junction then Heat shrink over the entire 3 wire bundle at the junction. I also ran both Wires for the Hyd Switching Valve using 18 AWG wire. I used crimps and then heat Shrink over the junction. I attached one of the Hyd Switching Valve wire to the Granding block. I also wired the Hyd Pump Solenoid positive terminal to the Positive terminal Block.
' style=

All Realys Installed

All Realys Installed

' style=

Solenoid Wired to Positive Terminal

Solenoid Wired to Positive Terminal

' style=

Solenoid Wired to Positive Terminal

Solenoid Wired to Positive Terminal

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.