KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  11-8-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  NLG Door

I used foam to build brackets for the gear doors. I used 2 plys BID on each side. After the brackets were built and fitted I attached them to the Aluminum collar and then applied FOX to the top of the brackets and closed the MLG and installed the door. I laid sand bags on to of the door the ensure it would stay closed and in position. Once the FLOX dried I opened the door/MLG and applied FLOX and 2 plys of BID between the bracket and the door.
' style=

MLG Door Bracket

MLG Door Bracket

' style=

Bracket installed on Collar

Bracket installed on Collar

' style=

R MLG Door Installed

R MLG Door Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.