KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  3-10-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Completed the Installation of the Carbon Hinges

I pushed FLOX through the Cleco holes and then used flox all around the hinge to get a smooth transition from the hinge to the structure. I then laid up 2 Plys BID at a 45deg angles to the hinge line on both the Rudder and the Winglet.
' style=

2 plys BID over Hinge

2 plys BID over Hinge

' style=

2 plys BID over Hinge

2 plys BID over Hinge

' style=

2 plys BID over Hinge

2 plys BID over Hinge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.