KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  11-25-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Completed Left Wing Top Structural Layup

I completed the required Structural layups to the top. 2 Ply BID followed by 7 Plys UNI. I then peel plyed everything, laid plastic sheeting over the peel ply and wrapped it all with a heating blanket. This is the 2nd time I've used the heating blanket and I LOVE IT.
' style=

Heating Blanket Curing the Top Structural Layup

Heating Blanket Curing the Top Structural Layup

' style=

Heating Blanket Curing the Top Structural Layup

Heating Blanket Curing the Top Structural Layup

' style=

Heating Blanket Curing the Top Structural Layup

Heating Blanket Curing the Top Structural Layup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.