KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  1-2-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Tightened all the Swegelok Fittings and installed

Used Gap measurment tool and tightened all fittings previously installed. Also installed the Oleo Strut Fittings and Aluminum Line.
' style=

Fittign Installed in Oleo Strut

Fittign Installed in Oleo Strut

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.