KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  12-27-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Wired Jumpers On to MLG Controller

Used unshielded AWG 18 Gage wire to install Jumpers per the Waiters Landing Gear Electrical Wiring Diagram. I also verified jumper positions with the Picture of a wired unit in the Waiters Landing Gear Controller installation Manual; However, I could not verify in the picture the jumper from Y-C3 to X100-C0 (White wire with Tape on it for identification ion the pictures). I will have John verify the jumpers are installed correctly. John Verified that the Jumpers were Installed correctly.
' style=

Controller Jumpers Installed

Controller Jumpers Installed

' style=

Need to Verify Jumper  Y-C3 to X100-C0 Is installed Correctly

Need to Verify Jumper Y-C3 to X100-C0 Is installed Correctly

' style=

Controller Jumpers Installed

Controller Jumpers Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.