KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  6-3-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Inside Layup forRear Canopy Bow

Prepaired the rear bow and used Micro to level inside of Canopy Bow, Let Dry and sanded to contour. I then applyed 2 Plys of BID @ 45 deg to inside of BOW and Peel Plyed it all. The next step will be to route out the area between the Outside bow and Inside Bow and then build a rollover bow like I did on the Roll Over structure. I know it is adding weight but my thought is if I make a Roll over bow in the rear of each Canopy Bow it will only improve the survival odds in a roll over event. VERY small price for peice of Mind.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.