BEZJet Build
' style=
Date:  5-16-2009
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Completeding Ouside Rollover Structure Layup

Prepaired outside area for layup. Sanded all areas for Layup and Bagged outside Layup in preperation for cutting canopy.
' style=

Prepaired outside area for Layup

Prepaired outside area for Layup

' style=

Bagged outside Layup in preperation for cutting canopy

Bagged outside Layup in preperation for cutting canopy

' style=

Bagged outside Layup in preperation for cutting canopy

Bagged outside Layup in preperation for cutting canopy