KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  12-13-2009
Number of Hours:  6.00
Manual Reference:  
Brief Description:  P-Porting Contouring of Welds

Before starting any Grinding I mask off the entire inside wear surface of the Rotor Housing to ensure no damage to the wear surface. I then used a Dremal tool withGrinding Rocks to contoure the welds, ensuring a smooth gas flow and Apex seal lap over P-Port hole. To test for smooth Seal ride, I used the side of a metal ruler to feel for rough edges.
' style=

P-Port welds contoured

P-Port welds contoured

' style=

Starting to Contour the 2nd Rotor Housing

Starting to Contour the 2nd Rotor Housing

' style=

Rotor housing #1 Completed

Rotor housing #1 Completed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.