KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  12-11-2009
Number of Hours:  10.00
Manual Reference:  
Brief Description:  P-Porting Rotor Housings

Sent Rotor Housing to Paul Lamar for P-Porting... Milled 2" hole and Welded SS Pipe in side of Housing to create the P-Port Exhust... The Next step is to contour Weld inside rotor housing and Pot the Tubs into the housing using Liquid Aluminum. Will also have to contour the Sealing block on outside of housing by using JB Weld.
' style=

P-Port Rotor Housing Side View

P-Port Rotor Housing Side View

' style=

P-Port Tube Welded into Rotor Housing

P-Port Tube Welded into Rotor Housing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.