Powered By Kitlog Pro v2.0
Aviation Partners, LLC Project
RV-10
Fuselage
5-17-2011
< Previous Log Entry
Next Log Entry >
Date:
5-17-2011
Number of Hours:
2.00
Manual Reference:
Section 27-6
Brief Description:
Installed Heat selector boxes
Installed the Front and Rear cabin heat selector boxes TG-10L and R. The Vans Aluminum parts were replaced with Stainless Steel boxes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
303
4002
Avionics
32
566
Empennage
24
254
Engine
7
79
Final Assembly
10
69
Firewall Forward
7
159
Flight Testing
2
67
Fuselage
157
1972
Interior
3
41
Miscellaneous
3
22
Paint
17
398
Prop
1
140
Wings
40
235
Copyright © 2001-2024 Matronics. All Rights Reserved.