KitLog pro

Powered By Kitlog Pro v2.0

Rogers Web Site
' style=
Date:  7-6-2014
Number of Hours:  4.50
Manual Reference:  8-4/5
Brief Description:  LG boxes

As most of the drilling had been carried out I then edged and debured all rivet holes and lightening holes, nutplates/rivet holes, on all parts. I loosely clecoed the parts back together, pic 1, to make sure everything still fitted and took it apart again.

I primed all parts, and left it to dry over lunch. After lunch, the parts were all touch dry so I put the LG together for a quick photo op, pic 2. I had decided to call it a day about then, but changed my mind and decided to get some riveting done first, before stopping.

So after taking the LGs apart again, I riveted the nutplates to the front and rear bulheads of the right LG box. I then riveted the corner angles to the front and rear bulkheads of both LGs. Lastly, I riveted the lower angles to the front and rear LG bulkheads. That was it for today.
' style=

After edging and debur, a quick check to make sure all is well.

After edging and debur, a quick check to make sure all is well.

' style=

Photo op for the primed LG boxes

Photo op for the primed LG boxes

' style=

Corner angles/ lower angles and platenuts riveted.

Corner angles/ lower angles and platenuts riveted.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.