|
|
|
|
Rogers Web Site
|
Date: 7-6-2014
|
Number of Hours: 4.50
|
Manual Reference: 8-4/5
|
Brief Description: LG boxes
|
|
As most of the drilling had been carried out I then edged and debured all rivet holes and lightening holes, nutplates/rivet holes, on all parts. I loosely clecoed the parts back together, pic 1, to make sure everything still fitted and took it apart again.
I primed all parts, and left it to dry over lunch. After lunch, the parts were all touch dry so I put the LG together for a quick photo op, pic 2. I had decided to call it a day about then, but changed my mind and decided to get some riveting done first, before stopping.
So after taking the LGs apart again, I riveted the nutplates to the front and rear bulheads of the right LG box. I then riveted the corner angles to the front and rear bulkheads of both LGs. Lastly, I riveted the lower angles to the front and rear LG bulkheads. That was it for today.
|
|
After edging and debur, a quick check to make sure all is well.
|
|
Photo op for the primed LG boxes
|
|
Corner angles/ lower angles and platenuts riveted.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |