KitLog pro

Powered By Kitlog Pro v2.0

Rogers Web Site
' style=
Date:  7-5-2014
Number of Hours:  3.00
Manual Reference:  8-4
Brief Description:  Landing gear boxes.

Today, I started on the LG boxes. I removed tabs and edged as instructed in the manual. then clecoed all parts together. I then drilled the #30 rivet holes out to full size and followed suit with the #12 bolt holes, leaving the bolt holes in the WD 813-1 weldments untouched for now as per the plans.
' style=

After fluting parts, look no gaps

After fluting parts, look no gaps

' style=

Port and starboard LG boxes clecoed together

Port and starboard LG boxes clecoed together

' style=

Drilling the rivet holes on the LG boxes.

Drilling the rivet holes on the LG boxes.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.