Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
Fuselage
9-21-2008
< Previous Log Entry
Next Log Entry >
Date:
9-21-2008
Number of Hours:
0.00
Manual Reference:
8-35
Brief Description:
Fuselage riveting #6a (photos from previous entry)
photos from the previous entry.
Riveting the F807 to the F813-L-1.
Riveting the F818B baggage rib angle to the F818 baggage rib.
Riveting the nutplates onto one of the F818B baggage rib angles.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.