Randy's 750 Cruzer Project
Work Logs Found: 25
Category Work Time: 49 Hours
 Date
Hours
Work Log Summary

Details

 10-22-2023
3.00
Installed the front torque tube bearing
       

 08-05-2023
4.00
Installed nose wheel steering rods
Details
       

 11-05-2022
3.00
Installed rudder & brake pedals & brake cylinders
       

 10-29-2022
1.00
Test fit rudder & brake pedals
       

 10-01-2022
5.00
Prep & drill brake pedals
       

 09-18-2021
2.00
Drilled and installed brake cylinder supports
Details
     

 08-21-2020
0.50
Doubled check cotter pins
Details
       

 08-20-2020
1.00
Drilled & riveted 2 of 2 elevator cable bearings
Details
       

 08-16-2020
1.00
Drilled & riveted 1 of 2 elevator cable bearings
Details

 08-13-2020
2.00
Deburred & prepped steel parts for powder coating
Details
     

 08-12-2020
1.50
Painted torque and elevator control tubes
Details
     

 08-10-2020
1.50
Drilled & installed torque tube bearing
     

 08-09-2020
2.00
Prepped torque and elevator control tubes for pain
Details

 08-05-2020
1.00
Installed horizontal flaperon control rods
Details
     

 07-25-2020
1.50
Riveted flap motor mount and control mixer assembl
       

 07-25-2020
1.50
Installed flaperon bellcranks and flap motor
Details
       

 07-21-2020
1.00
Drill holes in flaperon bellcrank bearings
Details

 07-20-2020
1.00
Debur and drill flaperon bellcranks
Details

 07-19-2020
1.00
Installed L angles onto flaperon control covers
Details
     

 07-18-2020
2.00
Continued work on baggage area
Details
     

 06-28-2020
1.00
Cleco flaperon mixer control tube into place
Details
       

 06-20-2020
2.00
Assemble flaperon mixer bearing supports
Details
       

 05-30-2020
5.00
Prep & paint flaperon control parts
Details
       

 05-24-2020
1.50
Finished drilling flap motor bracket
Details
       

 05-16-2020
3.00
Began drilling flap motor bracket
Details
       