KitLog pro

Powered By Kitlog Pro v2.0

Frank's Panther Cave
Work Logs Found: 123
Category Work Time: 493 Hours
 Date
Hours
Work Log Summary

Details

 06-14-2021
20.00
Continuation with right wing
Details
       

 05-17-2021
5.00
Setup for right wing
Details
       

 04-03-2021
3.00
Drill and rivet support angles to ribs
Details
       

 02-19-2021
15.00
Rivet right spar
Details

 02-15-2021
3.00
Install steel bushings into right spar
Details
       

 02-02-2021
8.00
Deburr spar caps and plates

 08-22-2020
15.00
Continuation of left wing
Details
       

 08-08-2020
20.00
Left wing construction
Details
       

 07-25-2020
3.00
Fill and sand on tailplane fairing
     

 07-11-2020
4.00
Some bad rivets to drill out and reset
Details
       

 05-23-2020
4.00
Trial fit for rudder cables and brake cylinders
Details
       

 05-09-2020
4.00
Installed instruments into panel
     

 04-27-2020
5.00
Drilling rear spar and wing access cover
Details
       

 04-21-2020
10.00
Continued riveting and installing hardware
Details
       

 04-02-2020
10.00
Rivet Squeezer
Details
       

 03-10-2020
6.00
Deburr holes in left spar
Details
       

 01-23-2018
10.00
Airleon Construction
Details
       

 01-08-2018
10.00
Flap Construction
Details
       

 11-27-2017
4.00
Seal back flange
Details

 07-25-2017
3.00
Paint Instrument panel
Details
       

 07-24-2017
2.00
Instrument Panel
Details

 07-12-2017
3.00
Proseal Right Tank
Details
       

 07-09-2017
3.00
Rudder cables
Details
       

 07-09-2017
3.00
Rudder cables
Details
       

 07-08-2017
8.00
Instrument Panel
Details
       

 06-14-2017
2.00
Rudder pivot blocks
Details
     

 06-11-2017
2.00
Elevator inspection plates
Details
     

 06-10-2017
3.00
Map pockets
Details
     

 05-16-2017
4.00
Instrument panel design
Details

 04-09-2017
3.00
Trim and throttle controls
Details
       

 04-08-2017
3.00
Boot cowl
Details
       

 03-19-2017
3.00
Elevator travel adjustment
Details
       

 03-18-2017
4.00
Trim Lever
Details
       

 03-15-2017
1.50
Right Tank
Details

 03-09-2017
1.50
Right Fuel Tank
Details
       

 03-07-2017
1.50
Right Fuel Tank
Details

 03-05-2017
6.00
Various work on fuselage
Details
       

 03-04-2017
6.00
Re-join fuselage
Details
       

 03-04-2017
4.00
Open up Fuselage bottom holes
Details
       

 02-18-2017
4.00
Seperate fuselage
Details
       

 02-05-2017
3.00
Cleko canopy to skirt
Details

 02-04-2017
3.00
Instrument panel
Details

 01-19-2017
6.00
Fitting canopy to frame
Details
       

 01-18-2017
4.00
Bubble to canopy inital fit
Details
       

 01-17-2017
4.00
Canopy frame
Details

 01-16-2017
4.00
Canopy frane
Details
     

 01-14-2017
2.00
More Sealant
Details

 01-13-2017
6.00
Seal Left tank
Details
       

 01-10-2017
6.00
Prepare left tank
Details
       

 01-09-2017
4.00
Rib 1
Details
     

 01-05-2017
8.00
Spar Drilling & Tailwheel rod
Details
       

 01-04-2017
8.00
Spar Drilling
Details
       

 01-02-2017
8.00
Rib 4 , Rib 7 and Rib 9 Modification
Details
       

 01-02-2017
4.00
Rib 1 modification
Details
       

 01-01-2017
4.00
Elevator and Flaps
Details
       

 12-31-2016
6.00
Elevator pushrod
Details
       

 12-30-2016
6.00
Rudder and brake pedal
Details
       

 12-29-2016
2.00
Control stick mixer
Details
       

 12-11-2016
0.00
Photo shoot
Details
       

 12-10-2016
4.00
Stabiliser Connection
Details
       

 11-18-2016
0.00
Second Jabiru Engined Panther Flies
Details
       

 11-13-2016
4.00
Vertical fin connection
Details
       

 11-12-2016
2.00
Flap handle
Details
       

 11-08-2016
2.00
Undercarriage legs
Details

 10-30-2016
2.00
Spar guides
Details
       

 10-29-2016
2.00
Fuselage
Details
       

 10-18-2016
2.00
Mount rear horizontal stabiliser angles
Details
     

 10-17-2016
4.00
horizontal stabiliser modification
Details
     

 09-11-2016
1.00
Control stick bearings
Details
       

 09-10-2016
2.00
Seat
Details
       

 09-10-2016
1.50
Elevator Pivot Arm
Details
       

 08-06-2016
2.00
Firewall Tunnel
Details
       

 08-01-2016
1.50
Instument cowl strips
Details
       

 07-24-2016
3.00
Fit undercarriage
Details
       

 07-23-2016
6.00
Tail Cone Connection
Details
       

 06-24-2016
4.00
Wheels and tailcone alignment
Details
       

 06-20-2016
4.00
Assemble tailcone and rivet
Details
     

 06-12-2016
6.00
Dimple/Countersink
Details

 06-05-2016
1.00
Machined axel fabrication
Details
     

 06-05-2016
0.00
Imperial Step Drill
Details
     

 06-05-2016
2.00
Fuel Pickups
Details
     

 06-04-2016
3.00
Match drill Right fuel tank
Details

 06-02-2016
1.50
Jig and trial fit
Details
       

 06-01-2016
4.00
Side Frames
Details
       

 05-22-2016
3.00
Match drill bottom
Details
       

 05-22-2016
3.00
Deburr and rivet assembly
Details
       

 05-21-2016
4.00
Angle supports/ deburr
Details
       

 05-09-2016
0.50
Root Ribs
Details
     

 05-09-2016
1.50
Caps and drains
Details
       

 05-07-2016
0.00
Drill bits and cutters
Details
     

 04-27-2016
1.00
Tailwheel
Details
       

 04-27-2016
6.00
Tailcone assembly
Details
       

 04-26-2016
7.00
Tailcone assembly
Details
       

 04-01-2016
8.00
Complete Kit Arrives
Details
       

 07-06-2014
2.00
Finish riveting skins
Details

 07-03-2014
4.00
Rivet Stabiliser
Details

 05-06-2014
2.00
Deburr and dimple skins
Details

 04-06-2014
2.00
Deburr and dimple spars
Details
       

 04-05-2014
4.00
Horizontal Stabiliser
Details
       

 04-04-2014
2.00
Horizontal Stabiliser
Details
       

 03-27-2014
2.00
Horizontal Tailplane - support jig
Details

 02-18-2014
2.00
Supafill tip and rivet second spar stiffener
Details
     

 02-12-2014
2.00
Rudder hinge correction and tip riveting
Details
       

 02-04-2014
2.00
Vertical stabiliser tip
Details
       

 02-03-2014
1.00
Vertical Stabiliser
Details
       

 02-02-2014
3.00
Vertical stabiliser and Spar stiffener
Details
       

 02-01-2014
4.00
Vertical Stabiliser
Details
       

 01-30-2014
3.00
Vertical stabiliser
Details
     

 01-29-2014
3.50
Vertical stabiliser
Details
       

 12-28-2013
3.00
Rudder
Details
     

 12-27-2013
5.00
Rudder
Details
       

 12-27-2013
5.00
Elevator
Details
       

 12-26-2013
3.00
Elevator
Details

 12-25-2013
2.00
Elevator drilling
Details
     

 12-24-2013
2.00
Elevator
Details
     

 12-21-2013
1.50
Elevator
Details
     

 12-18-2013
1.50
Elevator dimple
Details
     

 12-17-2013
1.50
Continued with elevator
Details
       

 12-16-2013
2.00
Elevator
Details

 12-14-2013
4.00
Horizontal spars
Details

 12-09-2013
4.00
Vertical stabiliser Spars
Details
       

 12-07-2013
2.00
Deburr and hinge gauge
Details

 11-30-2013
2.00
Delivery Of Tail Kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.