KitLog pro

Powered By Kitlog Pro v2.0

Swami's Web Site
Work Logs Found: 33
Category Work Time: 51 Hours
 Date
Hours
Work Log Summary

Details

 09-18-2019
1.00
Dehydrate plugs

 06-20-2019
0.00
ordered FWF fuel line from TSflightlines
Details

 06-16-2019
0.00
dehydrate spark plugs

 05-18-2019
0.00
Dehydrate plugs

 04-14-2019
0.50
replace spark plug dehyrators

 07-07-2018
2.00
sand snorkle inlet to fit

 07-05-2018
1.00
install EGT probes

 07-05-2018
3.00
fiberglass build-up snorkle inlet. Install CHT pro

 07-04-2018
1.00
install engine heater electrical cord

 05-08-2018
1.50
install oil cooler brace, fab and install cyl #4 b

 04-21-2018
1.00
review installation of snorkle

 04-15-2018
0.00
dehydrate engine plugs

 02-24-2018
2.50
install seat tube, breather oil scavenge, fuel lin

 02-11-2018
2.00
install Manifold press sensor. research engine wir

 02-08-2018
2.50
finish installing exhaust and hangers

 02-07-2018
1.50
start installing exhaust

 02-06-2018
1.50
measure hoses for new order

 02-03-2018
1.50
install sniffle valve, alternator

 02-03-2018
1.50
install new mix arm hdw + throttle bracket

 02-03-2018
1.00
install fuel vent line

 01-22-2018
2.50
install oil press line and sensor. test fit fuel i

 01-21-2018
0.75
test fit prop gov cable. test good

 01-21-2018
2.00
start install oil temp, fuel press sensors

 01-15-2018
2.00
STOP. can't figure out mixture geometry
Details

 01-15-2018
1.00
start install mixture brackets

 01-15-2018
1.50
research throttle and mixture brackets

 01-15-2018
1.50
final torque and cotter pin engine mount bolts

 01-14-2018
2.00
Hang engine
Details

 01-13-2018
4.50
prep engine install. start cowl hinge install

 01-07-2018
2.00
install prop governor and rod end bearing

 01-06-2018
2.50
work on prop governor, cable bracket

 12-30-2017
3.00
Install Reiff cylinder heater bands

 05-31-2017
1.00
Inventory firewall forward kit










Copyright © 2001-2020 Matronics. All Rights Reserved.