KitLog pro

Powered By Kitlog Pro v2.0

EAA Chapter 24 Kitfox
Work Logs Found: 98
Category Work Time: 902 Hours
 Date
Hours
Work Log Summary

Details

 03-11-2020
4.00
Exhaust mounting
Details
     

 03-11-2020
16.00
Attaching the horizontal stab and more tapes
Details
       

 02-19-2020
26.00
Mostly work to mount the engine
Details
       

 01-15-2020
0.00
Installing drain grommets in wings
Details
       

 01-15-2020
12.00
installiing drain grommets in wings
Details
       

 12-11-2019
6.00
Wing locker finish work
Details
       

 12-04-2019
12.00
More covering work on wings
Details
       

 11-27-2019
10.00
Work on seat pan
Details
       

 11-06-2019
12.00
wings and flaperons
Details
       

 10-30-2019
3.00
flaperon work
Details
       

 10-23-2019
12.00
finish rib lacing, cut holes for seatbelts in seat
Details
       

 10-16-2019
12.00
Wings and seat pan
Details
       

 10-02-2019
10.00
Placed the reinforcing tapes on the false ribs of
Details
       

 09-25-2019
6.00
work on right wing
Details
       

 09-25-2019
6.00

Details
       

 09-11-2019
6.00
Taping left wing
Details
       

 09-11-2019
6.00
Poly Brush applied to Right Wing
Details
       

 09-04-2019
6.00
wing taping and ironing
Details
       

 09-04-2019
6.00
Taping of the wings
Details
       

 08-28-2019
5.00
right wing covering
Details
       

 08-28-2019
5.00
Left wing prep and taping
Details
       

 08-21-2019
6.00
Rib lacing left wing
Details
       

 08-21-2019
8.00
Attaching fabric to top of right wing
Details
       

 08-14-2019
10.00
Covering of right wing
Details
       

 08-07-2019
10.00
Rib Lacing left wing
Details
       

 07-10-2019
6.00
2" tapes on rudder
Details
       

 06-19-2019
10.00
Marking up wings for tapes
Details
       

 06-12-2019
16.00
Wing covering
Details
       

 06-12-2019
0.00
Pictures of wing covering
Details
       

 06-05-2019
12.00
Wing covering
Details
       

 05-29-2019
18.00
Wing covering
Details
       

 05-29-2019
0.00
Wing covering
Details
       

 05-22-2019
30.00
pitot routing, fueltank rib bracing, nutplates fro
Details
       

 05-01-2019
18.00
wing saddle , rottisserie, painting
Details
       

 04-24-2019
20.00
misc prep for wing covering
Details
       

 04-17-2019
14.00
varnish and paint
Details
       

 04-10-2019
12.00
varnish and paint
Details
       

 04-03-2019
10.00
Varnish applied to wings
Details

 03-27-2019
15.00
Sanding, trailing edge reinforcement
Details
       

 03-20-2019
18.00
removed wings and preeped for covering
Details
       

 03-13-2019
18.00
installed wing tanks, drilled holes in floorboards
Details
       

 03-06-2019
18.00
slosh fuel tanks, install floor boards
Details
       

 02-06-2019
17.50
fuel tanks, rudder pedal mounts, floorboards
Details

 01-16-2019
12.00
Wingtips, floorboards, intrument panel
Details

 01-09-2019
17.00
Left Wingtip attachment work
Details
       

 01-09-2019
0.00
Additional pictures from 1/9
       

 12-05-2018
18.00
Most work was on drilling a hole in the instrument
Details
       

 11-14-2018
6.00
wingtip connections
Details
       

 11-14-2018
6.00
instrument panel construction
       

 11-07-2018
8.00
instrument panel and door
Details
       

 10-31-2018
12.00
flaperon hinges, instrument panel
Details
       

 10-24-2018
17.50
insturment panel and flaperon hinges
Details

 10-17-2018
7.00
flaperons and glareshield
Details

 10-10-2018
15.00
instrument panel
Details
       

 10-03-2018
15.00

Details
       

 09-26-2018
15.00
Right Fuel tank, Firewall & Flapperon reinforcemen
Details

 09-19-2018
15.00
floorboards and fire wall
Details
     

 09-05-2018
10.00
flapperons and engine cowling
Details

 08-29-2018
2.00

Details

 08-22-2018
15.00
floor board, firewall, fuselage
Details
       

 08-15-2018
6.00
Wing locker work
Details
       

 08-15-2018
6.00
floor boards and paint
Details
       

 08-08-2018
14.00
Flapperons, wing lockers, floor boards
Details

 08-01-2018
6.00
Admin!!
Details
     

 07-11-2018
12.50
flaperons and brakes
Details
       

 06-27-2018
7.50
flaperon work
Details
       

 06-20-2018
7.50
Brakes, wingtips
Details
       

 06-13-2018
7.50
odds and ends
Details

 06-06-2018
3.50
wing lockers and wing tips
Details

 05-30-2018
5.00
leading edge and wing locker
Details

 05-24-2018
5.00
rudder cable guides
Details
       

 05-16-2018
2.00
wing locker sides
Details
       

 05-16-2018
2.00
fuel tank pressure testing
Details
       

 05-15-2018
0.50
drilled hole in right control stick
Details
       

 05-09-2018
0.25
cut off wing extension posts
Details
       

 05-09-2018
13.00
covering work, fuel tank preparation
Details
       

 05-02-2018
4.00
rudder cable work
Details
       

 04-25-2018
3.00
planning session at hangar
Details

 04-18-2018
3.00
applied leading edge to port wing
Details
       

 04-11-2018
1.00

Details

 03-28-2018
7.00
leading edge installation
Details
       

 03-21-2018
6.00
rudder covering, leading edge work
Details
       

 03-14-2018
11.00
Worked on rudder system, fuel system, wing lockers
Details
       

 01-24-2018
7.00
control system rigging and covering
Details
       

 01-10-2018
7.00
covering tapes and control system
Details

 12-06-2017
8.00

Details

 11-29-2017
7.00

Details

 11-15-2017
9.00
Covering tail feathers
Details
       

 11-10-2017
25.00
Covering session
Details
       

 11-10-2017
0.00
Additional covering pictures
Details
       

 11-09-2017
4.00
reinforcement to damaged rudder
Details
     

 11-08-2017
6.00
sorting parts and more control system work
Details
       

 11-01-2017
12.00
rudder controls and covering elevator
Details
       

 10-25-2017
10.00
painting, covering, control system
Details
       

 10-24-2017
2.00
Sorting bolts
Details

 10-21-2017
2.00
Education
Details
       

 10-18-2017
8.00
Wing locker construction
Details
       

 10-18-2017
3.50
painting and flight controls
Details
       










Copyright © 2001-2020 Matronics. All Rights Reserved.