1. Right tank sloshed/cleaned out with acetone. 2. Final clean up of welding (small grinder & files) on the rudder pedal mounting tabs after reinforcing them. 3. Epoxy primed rudder pedal mounting tabs and tubing under the floorboards. 4. epoxyed (T-88) the pitot/static mount (piece of 1/8" plywood) in place.
Present for work, Jordan, Hannah, Frank, Nick, Pete, LTC Brown, and Eric Muehlberg x 2.5 hours = 17.5 hours
Eric has sanded and applied two coats of epoxy varnish to both sides of the floorboards and also fabricated the aluminum scuff plates to attached to the top of the floorboards. 6 hours labor.