Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Electrical/Instrumen
Work Logs Found:
26
Category Work Time:
90 Hours
Date
Hours
Work Log Summary
Details
01-27-2026
5.00
More wire and switches.
Details
01-26-2026
6.00
More wiring, circuits, and switches.
Details
01-25-2026
6.00
Running wire
Details
01-23-2026
2.00
Install pex in spar area for wire.
Details
01-21-2026
5.00
Wiring Lights
Details
02-17-2019
5.00
Fuel probes get wired in.
Details
02-16-2019
5.00
Alternator and regulator wiring
Details
02-08-2019
4.00
More wiring done on the plane.
Details
02-04-2019
4.00
Working on the electrical system.
Details
04-16-2018
3.00
Bus bar for fire wall side.
Details
03-26-2018
3.00
Wired in jumper and charger wires from the out sid
Details
03-23-2018
4.00
Wire in starter relay and starter.
Details
03-15-2018
6.00
Working on wiring in battery and main power.
Details
03-15-2018
0.00
More on the wire work.
Details
03-13-2018
8.00
Running more wire for defrost and power bars.
Details
03-01-2018
4.00
Made power bar for positive and negative.
Details
02-22-2018
4.00
Made landing rear switch panel
Details
02-20-2018
3.00
Had to move avionics tray.
Details
02-07-2018
4.00
Wiring the overhead lights and switches in.
Details
04-20-2017
1.00
Wire from nose gear micro switch
Details
01-05-2017
1.00
Install welding receptacles for charging and jumpi
Details
01-03-2017
2.00
Welding plugs for external charging and jumping.
Details
06-05-2013
1.00
Pushed in switches and bolted in place.
Details
06-01-2013
1.50
Cut panel for swiches
Details
05-31-2013
1.50
Ran wire for over head lights
Details
05-22-2013
1.00
Swiches to make things brighter
Details
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
861
2586
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
79
196
Electrical/Instrumen
26
90
Engine/Propeller
142
434
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
138
412
Fuselage
78
204
Inspections
1
1
Instrument Panel
7
20
Interior
53
194
Kit Purchase/Conditi
2
26
Landing Gear/RG
31
108
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
37
102
Copyright © 2001-2026 Matronics. All Rights Reserved.