Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 06-20-2016
  | 
	1.50
  | 
	install nutplates fwd fuse bulkheads, prep for ski
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-15-2015
  | 
	5.50
  | 
	start putting plane back together
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-14-2015
  | 
	2.00
  | 
	install F810-A, trim elevator to HS gap
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-19-2015
  | 
	6.00
  | 
	begin installing top fuse skin
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-18-2015
  | 
	6.50
  | 
	prep and paint top front skin for installation
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-05-2015
  | 
	6.50
  | 
	rework boarding step
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-23-2015
  | 
	6.00
  | 
	rig aileron trim, reinstall panel and seats for fi
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-22-2015
  | 
	3.50
  | 
	reinstall control tube, recheck rigging and adjust
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-21-2015
  | 
	8.00
  | 
	finish baggage door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-16-2015
  | 
	5.00
  | 
	emp fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-15-2015
  | 
	7.00
  | 
	mount NACA vents, fit empenage fairing
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-14-2015
  | 
	6.00
  | 
	reassemble (final?) control tube, mount empenage f
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-07-2015
  | 
	7.00
  | 
	control system rigging
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-19-2014
  | 
	6.00
  | 
	rerouted rudder cables
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-05-2014
  | 
	2.50
  | 
	fab plywood work floor per drawing 85
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-06-2014
  | 
	1.50
  | 
	fab custom plate for carb and cabin heat controls
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-04-2014
  | 
	1.50
  | 
	finish and test fit mixture bracket
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-02-2014
  | 
	2.50
  | 
	custom fab mixture bracket
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-17-2014
  | 
	7.00
  | 
	rebuild rudder stops to prevent cable interference
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-06-2014
  | 
	6.00
  | 
	install L gear, begin reinstalling emp
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-05-2014
  | 
	4.00
  | 
	install L gear, test panel recess mod
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-04-2014
  | 
	6.50
  | 
	reinstall control tube, interiro panels
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-03-2014
  | 
	7.00
  | 
	reassemble fuse after paint
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-31-2014
  | 
	8.00
  | 
	finish bottom fuse polish, begin reassembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-04-2014
  | 
	5.00
  | 
	reassemble rudder pedal assy, prep fuselage for pa
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-03-2014
  | 
	1.00
  | 
	reassemble and adjust throttle quadrant after pain
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-25-2013
  | 
	4.00
  | 
	finish fwd baggage mod
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-23-2013
  | 
	3.00
  | 
	modify fwd baggage compartment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-02-2013
  | 
	1.50
  | 
	fabricate custom abs map compartment
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-01-2013
  | 
	3.00
  | 
	fab and install rudder stops
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-19-2013
  | 
	4.00
  | 
	elevator control rigging
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-18-2013
  | 
	4.50
  | 
	elevator horn, cup holder
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-17-2013
  | 
	2.00
  | 
	finish inst. panel access cover
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-14-2013
  | 
	8.00
  | 
	finish cabin cover, begin fab on custom instrument
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-13-2013
  | 
	5.50
  | 
	fab rudder stops, rebuild L cabin cover
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-03-2013
  | 
	5.00
  | 
	rudder pedals and brake master cyls
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-25-2013
  | 
	2.50
  | 
	rivet front baggage door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-23-2013
  | 
	4.00
  | 
	rear rod end covers
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-21-2013
  | 
	4.00
  | 
	nut plates & cosmetics
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-12-2013
  | 
	2.00
  | 
	rework baggage door hinges, dimple
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 02-10-2013
  | 
	3.00
  | 
	replace stock control hangar with one-piece unit
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-07-2013
  | 
	5.00
  | 
	baggage door and mid fuselage
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 02-06-2013
  | 
	1.50
  | 
	fwd baggage door cont.
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-05-2013
  | 
	5.00
  | 
	fwd.  baggage door  fit, debur and dimple
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 02-02-2013
  | 
	5.00
  | 
	roll bar and rear headrest weldment + front seat
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-01-2013
  | 
	5.00
  | 
	top skin and baggage door
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-28-2013
  | 
	4.00
  | 
	modified and finished back seat back
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-26-2013
  | 
	4.00
  | 
	mid cabin covers
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-25-2013
  | 
	4.50
  | 
	custom throttle quadrant, bulkhead channels
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-23-2013
  | 
	5.50
  | 
	interior fuselage
  | 
	
		 | 
	
			      
		 		 
		       | 
 
	
  | 
	
	
	 01-22-2013
  | 
	6.00
  | 
	flap and aileron controls
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-22-2013
  | 
	2.00
  | 
	fit rear side panels
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-17-2013
  | 
	4.50
  | 
	prep and install floor panels and baggage floor
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-16-2013
  | 
	2.50
  | 
	install rudder cable, front seat floor
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-15-2013
  | 
	3.50
  | 
	inspect and verify fuse construction pgs 8-5 thru 
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 01-14-2013
  | 
	1.20
  | 
	inspect and verify floor assy construction p.8-4
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 01-11-2013
  | 
	6.00
  | 
	boarding step
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-10-2013
  | 
	2.50
  | 
	fit and rivet bulkhead doubler for entry step
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-09-2013
  | 
	2.00
  | 
	fuselage inspect & verify
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 01-09-2013
  | 
	3.50
  | 
	fit and drill F812OB step bulkhead reinforcement
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-30-2012
  | 
	5.00
  | 
	nut plates cont.
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-15-2012
  | 
	3.00
  | 
	nut plates
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-14-2012
  | 
	3.00
  | 
	plate nuts
  | 
	
		 | 
	
			      
		         |