Date:  2-5-2015
Number of Hours:  6.50
Manual Reference:  
Brief Description:  rework boarding step

I discovered that my original installation of the boarding step did not allow enough clearance from the rudder cable. Relocated plastic end mount lower to get clearance, and made a doubler to compensate for extra holes drilled. Also needed to fab spacers on the outside as new lower positon created a gap at the bottom, which will be concealed by the fairing.