Date
|
Hours
|
Work Log Summary

|
Details

|
07-08-2012
|
8.00
|
Rib Installation Vertical Stabilizer.
|
Details
|
|
|
05-28-2012
|
3.00
|
Beginning Rudder Installation.
|
Details
|
|
|
05-02-2012
|
10.00
|
Installation of rudder adjusting levers.
|
Details
|
|
|
04-27-2012
|
4.00
|
Rudder Cable Pulley Installation.
|
Details
|
|
|
04-26-2012
|
14.00
|
Install adjustable rudder controls & brake master
|
Details
|
|
|
04-13-2012
|
10.00
|
Installation of rudder torque tube assembly.
|
Details
|
|
|
04-08-2012
|
10.00
|
Constructing the Rudder Pedal Torque Tubes.
|
Details
|
|
|
03-21-2012
|
4.00
|
Final floorboard installation.
|
Details
|
|
|
03-18-2012
|
12.00
|
Wood & Aluminum floor Installation.
|
Details
|
|
|
03-08-2012
|
4.00
|
Elevator Mid & Aft push pull tubes installed.
|
Details
|
|
|
03-06-2012
|
5.00
|
Elevator Aileron Mixer and Push Pull Tubes Install
|
Details
|
|
|
03-05-2012
|
4.00
|
Flap Handle Construction & Installation.
|
Details
|
|
|
03-03-2012
|
4.00
|
Flaperon Mixer Assembly.
|
Details
|
|
|
02-23-2012
|
3.00
|
Elevator Bellcrank and Push Rod Installation.
|
Details
|
|
|
02-22-2012
|
4.00
|
Control Stick Assembly Installation.
|
Details
|
|
|
02-22-2012
|
2.00
|
Aileron Bellcrank Installation.
|
Details
|
|
|
02-17-2012
|
6.00
|
Completed Control Column Assembly.
|
Details
|
|
|
02-12-2012
|
14.00
|
Control Column Assembly.
|
Details
|
|
|
02-04-2012
|
12.00
|
Control Column Bracket Assembly.
|
Details
|
|